Second Saw Centre has just been commissioned
September 24, 2009
| Here at Alexander Windows we have just commissioned a second saw centre which takes our output capacity to 1500 frames per week! This doubling of our capacity means that your Trade frames are always ready on time when you need them. The name ’saw centre’ doesn’t do it justice because this machine does every cut, mitre, drilling and routing that is required in the finished article. It even knows what off-cuts have been produced and will call for them when it can use them, thus minimising the waste. |
| xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx |
|
| Producing Trade uPVC windows and doors to the highest standards requires the very latest in computer controlled machinery. After loading the welders with the accurately cut sections from the saw centre thes following pictures illustrate the result of welding process. The final picture illustrates the process used to clean up the welds. The frame is now ready to move to the next part of the production process. |
![]() Profile Loaded Ready to Weld |
![]() Finished Welding 1 minute later |
![]() Cleaning up and Trimming the welded joints |

New Digital Saw Centre

